Jubilant success at Kharsang field
Jubilant Energy said yesterday that its KSG#70 well, the sixth and last development well of the Phase-III Extension drilling campaign in the Kharsang Field had successfully tested for oil and has been put into production at an initial gross rate of 38 barrels of oil per day (bopd) by artificial lift. The field, in Arunachal Pradesh, in the north-east of India, is operated by GeoEnpro Petroleum, a joint venture between GeoPetrol and Jubilant.